Upland Excavating completed several detailed studies and reports for the purpose of modernizing its current landfill facility. These extensive studies were done to understand the site’s hydrogeological, hydrological, and geologic conditions. In addition, the company also prepared a landfill design, operation and closure plan, and an environmental effects monitoring plan
Highlights of the studies:
- The groundwater does not flow to Rico Lake, McIvor Lake, nor the Cold Creek watershed, which supplies the Quinsam River Hatchery.
- Modeling of the future landfill performance verifies water quality standards will be met at the site boundary at all times.v
We are focused on
All the studies and reports can be found here:
- 2021 Annual Report
- 2019 Annual Report
- Site Location Map
- Site Plan
- Technical Assessment Report
- Technical Addendum
- Technical Response to ENV Review
- Technical Response to ENV Review Task 8 – Sand and Gravel Aquifer Pumping Tests
- Technical Response to ENV Review Task 7 – Additional Bedrock Characterization
- Technical Response to ENV Review Task 7 – Additional Bedrock Characterization Cover Letter
- 2018 Technical Work Plan and Schedule
- Compliance Checklist
- Existing Conditions
- Hydrogeology and Hydrology Characterization Report
- Independent Peer Review Upland Landfill Waste Discharge Application
- Location and Volume of Existing Waste
- Permit Fee Calculation
- Preliminary Report Financial Security Plan
- Regulated Open Burning
- 2017 Water Quality Monitoring Results
- 2017 Design, Operations, and Closure Plan
- Patrick Consult
- Response to DFO Letter
- Response to Island Health
- Response to Labour Council
- Response to Comments
- Response to Waterline’s Hydrogeological Review
- Groundwater and Surface Water Monitoring Data
- 2020 Operations and Monitoring Report
- 2022-01-20 107869 405141 Draft OC Ammendments