Upland Excavating completed several detailed studies and reports for the purpose of modernizing its current landfill facility. These extensive studies were done to understand the site’s hydrogeological, hydrological, and geologic conditions. In addition, the company also prepared a landfill design, operation and closure plan, and an environmental effects monitoring plan

Highlights of the studies:

  • The groundwater does not flow to Rico Lake, McIvor Lake, nor the Cold Creek watershed, which supplies the Quinsam River Hatchery.
  • Modeling of the future landfill performance verifies water quality standards will be met at the site boundary at all times.v
BCCSA COR Certified

MISSION STATEMENT

Committed to protecting the environment while consistently exceeding our clients expectations.
Committed to community building and development delivering exceptional quality construction projects, while maintaining budget and schedule goals.

7295 Gold River Highway Campbell River, B.C.
V9H 1P1
250-286-1148
TF: 1 877 488-1818
Fax: 250-286-3546
Uplands Contracting Footer Logo

TOLL FREE: 1 877 488-1818 | Local : 250-286-1148 | Fax: 250-286-3546
7295 Gold River Highway, Campbell River, B.C. V9H 1P1
COPYRIGHT © 2022 – Upland Contracting Ltd. All Rights Reserved
site design Cahill Web Studio